SCALABLE SAN IMPLEMENTATION TESTING AND TROUBLESHOOTING
Please click here to goto the main NS0-504 Study Notes blog post to see all sections and additional information
4.1 Be able to create an acceptance test plan.
4.2 Test host to storage connectivity
- Possible failures in connectivity?
- Improper zoning
- NPIV not enabled on switches
4.3 Test LUN availability during failover scenarios (multipathing).
4.4 Test controller failover scenarios (multipath HA).